Bandeath Green Energy Project proposal includes; River source heat pump installation including pump house and pipe mains; erection of glasshouses and ancillary buildings; construction of rainwater reservoir, accesses, hardstandings and parking; upgrade existing access road.
TGP were commissioned by Bandeath Holdings Ltd to undertake an LVA of the proposed Bandeath Green Energy Project on land at Bandeath Industrial Estate, approximately 3.4km east of Stirling. The LVA report was been prepared with the aim of identifying the potential landscape and visual effects of the proposed glasshouse, river source heat pump and associated infrastructure.